how to calculate sand consumption for 1 cum of m30 concrete

    cement:sand= 1:5 for 1cum= 1/6 =0166 so cement for 1 cum ,, Answer Posted / ashwin cement:sand= 1:5 for 1cum= 1/6 =0166 so cement for 1 cum=0166cum but volume of 1 cement bag is=033cum bag required per cum is=166/033How to Calculate Quantities of Cement, Sand and Aggregate ,, Jan 24, 2018· Ratio for M20 concrete is 1 : 2 : 4 Step-1: Calculate the Volumes of material required in 1 Cum concrete The dry volume of concrete mixture is always greater than the wet volume The ratio of dry volume to the wet volume of concrete is 154 So 154 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concreteAPPENDIX, 040 cum 038 cum 13 Cement concrete 1:15:3 cum Metal Cement Sand 082 cum 0283 cum 041 cum 14 Cement concrete 1:2:4 cum Metal Cement Sand 085 cum 022 cum 043 cum 15 Cement concrete 1:3:6 cum Metal Cement Sand 090 cum 0154 cum 045 cum 16 Cement concrete 1:4:8 cum Metal Cement Sand 092 cum 012 cum 046 cum 17 Cement concrete 1:5:8 cum ,Calculation of Cement and Sand Quantity for Plastering, Method-1: DLBD method to Calculate Cement, Sand and Water required for Plaster (1:4) For calculation purposes, lets assume that the area that needs to be plastered is 100 sqft (10 ft X 10 ft wall) and a Plaster of Mix ratio 1:4 (cement:sand) is used We shall use DLBD method (Dry Loose Bulk Density) in determining the ratiosCement and Sand ratio for brickwork How to Calculate ,, To calculate the cement quantity ; The ratio of cement mortar is 1:5 The sum is 1+5 =6 Thus, the total dry mortar required for 1 cum brick masonry is30cum So, The required cement is (30×1)/6= 005 cum After converting into KG=05×1440=72KG When converted KG into the number of bags= 72/50=144bag To calculate the sand quantity.

    Get Price

    how we calculate of Sand, cement and aggregate of M20 ,, M20 (1 cement :15 sand :3 stone/brick aggregate) To determine the proportions you have to perform mix design, for this you have to find out the spgr of cement, CA, FA, and water cement ratio ,for m30 grade we have to calculate the quantity of all ,, Answer Posted / [email protected] universit for m30 grade we have to calculate the quantity of all ingredients of concrete by design mix as per IS 10262-2009it depends upon the whether admixture is ,How to Calculate Cement, Sand Quantity for Plastering ,, Aug 08, 2018· Density of Aggregate = 1450-1550 kg/m 3 How many KG in 1 bag of cement = 50kg Cement quantity in litres in 1 bag of cement = 347 litres 1 Bag of cement in cubic metres = 00347 cubic meter How many CFT (Cubic Feet) = 1226 CFT Numbers of Bags in 1 cubic metre cement = 288 Bags Specific gravity of cement = 315Calculation of Cement and Sand for Plastering Excel Sheet, Dec 16, 2020· The mix for the finishing coat shall depend on the texture and colour of the surface desired If the surface is to have a lime-putty finish,then it is advisable to have rich mix of 1 part of cement,1 part of lime and 3 parts of sandFor any rough finish a mix of 1 part of cement to 3 to 4 parts of sand is recommendedConcrete Calculator, Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix Ans Materials required are 7 nos of 50 kg bag of cement, 042 m 3 of sand and 083 m 3 of stone aggregate.

    Get Price

    Concrete 1 cubic meter volume to kilograms converter, CONVERT : between other concrete measuring units - complete list Conversion calculator for webmasters Concrete This general purpose concrete formulation, called also concrete-aggregate (4:1 - sand/gravel aggregate : cement - mixing ratio w/ water) conversion tool is based on the concrete mass density of 2400 kg/m3 - 150 lbs/ft3 after curing (rounded)How To Calculate Of Cement, Sand And Aggregate For M10 ,, Volume of concrete = 1 m³ Grade of concrete M20 (1:15:3) Find-out the Quantity of concrete (Wet volume and Dry volume) Wet volume of concrete = 1 m³ Dry volume = Wet volume x 154 (You can also take it as 150 to 155, But it became standard practice to considering 154 as multiplication factor) Dry volume of concrete = 1 x 154 =154 m³ ,Please help me to do how to calculate cement sand ,, Dec 30, 2011· Plaster 1:3 will be as cement=1/4,sand=3/4,but 25% extra material required to fill the voids among material and another 20% required for uneven surface of wall therefore for 100 sqm area of plaster of 12 mm thick will be=100x0012x125x12x1/4=045 *** & sand 3 times=135 ***CEMENT CONCRETE MIX DESIGN, 5a Approximate sand and water contents per cum of concrete W/C = 06, Workability = 08 CF (For medium strength concrete up to M35) Maximum size of aggregate (mm) Water content including surface water per m³ of concrete (kg) Sand as % of total aggregate by ,How To Calculate Cement, Sand & Aggregate Quantity in ,, Sep 13, 2018· Hello Friends,In this video we will learn how to make own calculator for calculating Cement, Sand & Aggregate quantity for different type of concrete Mix, wi,.

    Get Price

    Civil At Work: HOW TO CALCULATE QUANTITIES OF CEMENT, SAND ,, Oct 28, 2017· Calculate Material requirement for producing 1 cum Concrete From the above calculation, we have already got the weights of individual ingredients in concrete So, the weight of concrete produced with 1 Bag of cement (50 Kgs) =50 kg + ,Quantity of Bricks Calculation in wall and Cement,Sand ,, Oct 13, 2017· Suppose we have to construct the wall having a volume of the 1-meter cube, the size of brick is going to use is 190 mm ×90 mm ×90 mm and mortar is 8 mm thick with the ratio of 1: 4 So 1) Calculate the number of bricks? 2) The quantity of cement? 3) The quantity of sand?Concrete Mix Design Calculations, The concrete mix design available on this site are for reference purpose only Actual site conditions vary and thus this should be adjusted as per the location and other factors These are just to show you how to calculate and we are thankful to all the members who have emailed us these mix designs so that these could be shared with civil ,To Calculate Quantity Of Sand And Aggregate In M30 Concrete, mix ratio of cement sand aggregate for concrete grade 30 how do we calculate quantity of cement, sand and aggregates in 1 , 2, In the case M30 concrete we calculating by design mixbut incase of norminal , to find out ,For one meter cube of concrete how much kg steel is ,, For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0001, for bending with axial force mus =00025, b ,.

    Get Price

    HOW TO CALCULATE QUANTITIES OF CEMENT, SAND AND ,, Calculate Material requirement for producing 1 cum Concrete From the above calculation, we have already got the weights of individual ingredients in concrete So, the weight of concrete produced with 1 Bag of cement (50 Kgs) =50 kg + 140 kg + 203 kg + 275 kg = 4205 kg say 420 kgsHow to Calculate Quantities of Cement, Sand and Aggregate ,, The ratio of dry volume to the wet volume of concrete is 154 So 154 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete Volume of Cement required = 1/(1+2+4) X 154 = 1/7 X 154 = 022 Cum Volume of Sand required = 2/7 X 154 = 044 Cum or 1553 cftHow To Calculate Cement, Sand Quantity For Plastering, Jun 30, 2017· = 100 m 2 x 0012m = 12 m 3 (This is wet volume of cement mortar (after mixing water) but we need dry volume To get dry volume consider 35% bulking of sand and 20% wastages = 12 m 3 x (1+02+035) (Rather than 35% sand bulkage and 20% wastage you can add 154 as constant)How To Calculate Number Of Bricks, Cement And Sand For ,, Dry volume of a mortar = 02305 cum X 133 = 0306565 cum We know the mortar ratio is 1:6 (1 part Cement & 6 Part Sand = 7 Part) Required amount Cement quantity in brickwork = 0306565 X 1,Calculate Cement Sand & Aggregate, Calculate the concrete quantity required in cubic meter and then multiply the quantity with the cement sand and aggregate for 1 cubic meter of concrete In your case Volume of concrete = 17 x 17 x 05 = 14 cum It looks like you are using m20 grade mix with extra sand If you follow that mix proportion then to calculate use this following ,.

    Get Price

    Civil At Work: STANDARD CEMENT CONSUMPTION, Nov 16, 2014· Providing and laying skirting and dado of polished Shahabad stone 25 to 30 mm with 1:4 CMRCC Calculator | Estimate Cement, Sand, RCC Online Calculator, Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly At materialtree, you can also shop for superior quality cement bags at best market priceThumb Rules used in the Construction by Civil Engineering, Dec 14, 2018· Step 1: Calculate the Volume of Concrete Total Volume of Concrete for above given Slab is 5 x 4 x 015 = 3m 3 Step 2: Calculate the steel quantity using formula As per the above table, the steel quantity of slab is 1% of the total volume of concrete utilizedConcrete Mix Design Calculation for M20, M25, M30 Concrete, Sep 19, 2020· The Mix Design process is normally implemented for the structure that needs higher grades of concrete like M25, M30, etc, and where consumption of Concrete is high Concrete Mix Design for M20, M25, M30, and higher grades of concrete can be ,How to Calculate Cement, Sand and Coarse Aggregate ,, For Cement, Sand and Coarse Aggregate This is a Volumetric Calculation Assuming we need 2 m 3 of concrete for M20 Concrete Mix, (Mix Ratio, M20 = 1 : 15 : 3) Total Part of the Concrete = 1+15+3 = 55 Parts Therefore, Cement Quantity = (Cement Part / Concrete Parts ) * Concrete Volume.

    Get Price

Get Solutions & Quotation

Dear friend, please fill in your message if you like to be contacted. Please note that you do not need to have a mail programme to use this function. ( The option to mark ' * ' is required )

Call Us: 58386166
Company Address: No. 1688, Gaoke East Road,
Pudong new district